Head office Complex for Sierra Group
Project consists of 7470 Sq. M Office complex on 13-story structure with one and half floors of car parking.
Detail Designs and Construction Supervision for MEP components as below:
- Three passenger Lifts.
- Fire detection and protection system.
- Power supply with 1000 kVA capacity.
- Standby generator for 1000 kVA capacity.
- Centralized Air conditioning system consisting of 2640000BTU.
- Rainwater harvesting system.
Category
Location
Colombo 05, Sri Lanka
Duration
November 2012 to March 2018
Client
Sierra Group
Services of the Company
Sole Consultant for MEP Components
Designers
Eng. Bandu Mahasen
Electrical Engineer/Consultant
Eng. J Jayasignhe
Mechanical Engineer/ Consultant
Eng. Nihal Sooriyarachchi
Water and Wastewater Engineer/ Consultant
Eng. Nidas Dasanayake
Mechanical Engineer
Eng. Ishara Udayanga
MEP Design Coordinator and Site Representative