Kelaniya – Mudungoda Road (B214)
Rehabilitation, Improvement and Maintenance of Kelaniya – Mudungoda Road (B214) From Nagahamula Junction to Delgoda (6+300 km TO 19+000 km).
The Ministry of Highways (MoH) has undertaken Rehabilitation / Improvements and Maintenance of about 70 km National in Western Province in eight contracts under the Second Integrated Investment Road Program for which the Government of Sri Lanka has received a loan from the Asian Development Bank (ADB).
WKK Engineering Company (Pvt) Ltd is the Design and Build contractor of the project, who assigns NSA as the design sub-contractor to the project. NSA carries out detailed designs including the pavement design, geometric designs, hydrology study and structural designs of the culverts and bridges of the project. Further to the above designs, the NSA design team performs the designs of road signs & lane marking, junction improvement drawings and design cross sections to facilitate the construction.
The road is designed and constructed to pre-determined standards in order to fulfil a particular function required by road users. As the B214 road caters for the heavy vehicle movements of Biyagama Export Processing Zone all the requisite road safety standards are being considered for the designs.
Category
Location
Biyagama, Sri Lanka
Duration
2022 May – On going
Client
WKK Engineering Company (Pvt) Ltd.
Services of the Company
All the Design Work of Highways including pavement designs and geometric designs. Hydrological Study for the Flood Prone Sections.
Designs of Road Structures including retaining walls, bridges and culverts.
Designs of road signs and lane marking including designs of road furniture.
Designers
Eng. Uditha Hiranya
Pavement Design Engineer
Eng. Sameera Priyanath
Senior Structural Engineer
Eng. Nimesh Priyankara
Highway Design Engineer
Eng. Dasun Tharaka
Highway Design Engineer